If you've no account register here first time
User Name :
User Email :
Password :

Login Now

Deyo Installs Solar System at Power Manufacturing Plant

Pacific Energy is finishing the installation of 90 of 180 solar panels as part of an energy-efficient system at Deyo, the makers of custom bicycling clothing for Team Voler Apparel, according to the Times Press Recorder.

Grover Beach, California city officials said the solar panel project is the largest in the city’s history, based on records dating back to 1997. According to building officials in Pismo Beach and Arroyo Grande, no commercial solar panel system exists in either of the two cities that rivals the scale of the 180-panel Grover Beach project.

The installation cost an estimated $300,000, with rebates expected to reimburse 40 percent of that cost. The energy created by the panels will power one 18,000-square-foot building, which houses sublimation cylinders and sewing machines.

Practical Guide to Transforming Energy Data into Better Buildings
Sponsored By: Lucid

  
Financing Environmental Resiliency and a Low-Carbon Future with Green Bonds
Sponsored By: NSF International

  
Top 10 Steps for a Successful EMIS Project
Sponsored By: Sphera Solutions

  
Video: Expense & Data Management for Complex Payables
Sponsored By: Ecova, Inc.

  

Leave a Comment