If you've no account register here first time
User Name :
User Email :
Password :

Login Now

Toyota Wants To Power Engine Factory With Wind

Members of Flintshire County Council in the UK are considering a planning application from Toyota for a temporary wind monitoring mast at the automakers engine factory in Flintshire’s Deeside Industrial Park, icWales reports. The 60-meter mast would monitor wind speeds at various heights over 12 months, to determine the viability of using wind power.

Graham Hillier of Toyota UK said no decision would be taken on the number or size of wind turbines until the monitoring results were available.

“From our viewpoint, it’s a green and cost-effective method to help our business,” he said. “It complements Toyota’s green credentials. In our European region there’s a strong emphasis on environmental issues.”

The Deeside factory has a rainwater harvesting system with reverse osmosis to purify the water.

Operationalizing EHS Management: Bridge the Gap from Strategy to Execution
Sponsored By: LNS Research

  
Planning for a Sustainable Future
Sponsored By: Dakota Software

  
Choosing the Correct Emission Control Technology
Sponsored By: Anguil Environmental Systems

  
Practical Guide to Transforming Energy Data into Better Buildings
Sponsored By: Lucid

  

Leave a Comment