If you've no account register here first time
User Name :
User Email :
Password :

Login Now

Chrysler Tests Wind Potential At Chelsea Proving Grounds

chelsea_proving_grounds.jpgChrysler is erecting a 26-story meteorological tower at its Chelsea Proving Grounds to determine if high-level winds are suitable for generating electricity. Energy experts from Washtenaw County, the University of Michigan and the consulting firm, North Coast Wind and Power, will monitor the site.

If the study yields favorable results, Chrysler says it will investigate the potential to construct turbines on the property.

A study of Washtenaw County wind energy potential, along with other related documents, is available here.

Packaging LED & Advanced Rooftop Unit Control (ARC) Retrofits for Maximum Performance
Sponsored By: Transformative Wave

  
Environmental Leader Product and Project Awards 2017
Sponsored By: Environmental Leader

  
The EHS Guidebook: Selecting, Implementing, and Using EHS Software Solutions
Sponsored By: EtQ

  
Financing Environmental Resiliency and a Low-Carbon Future with Green Bonds
Sponsored By: NSF International

  

Leave a Comment