If you've no account register here first time
User Name :
User Email :
Password :

Login Now

Wates Group Discusses Sending Zero Waste to Landfill


In 2006 Rachel Woolliscroft set out to reduce the amount of construction waste Wates was sending to landfill. The disposal was costing Wates over £3.5 million pounds a year. Rachel set a target for all of the firm’s non-hazardous waste to be recycled by 2010.

Her campaign started with an initiative to encourage construction sites to separate their waste to make it easier to recycle with limited success. Rachel then turned her attention to the firm’s waste contractors. She encouraged Wates to put in place long term trading agreements with waste companies that were prepared to invest in segregation facilities at their depots.

The solution was a success. As a result of Rachel’s campaign, the amount of waste Wates’ now sends to landfill has been reduced from 47% in 2005 to just 5% in 2010. “This campaign continues to be a catalyst to drive engagement around the sustainability agenda,” she says.

Practical Guide to Transforming Energy Data into Better Buildings
Sponsored By: Lucid

  
Financing Environmental Resiliency and a Low-Carbon Future with Green Bonds
Sponsored By: NSF International

  
The EHS Guidebook: Selecting, Implementing, and Using EHS Software Solutions
Sponsored By: EtQ

  
The New Energy Future - Challenges and Opportunities in Corporate Energy Management
Sponsored By: Edison Energy

  

Leave a Comment