IBM Sustainability Report: $43M in Energy Costs Saved in 2011

IBM saved $43 million in energy expenses last year, conserving 378,000 MWh of electricity and 326,000 million BTUs of fuel oil and natural gas through hundreds of conservation projects, according to the company’s 2011 corporate responsibility report.

IBM’s energy conservation projects saved the equivalent of 7.4 percent of its total energy use, surpassing its corporate goal of 3.5 percent. These projects also avoided 175,000 metric tons of carbon dioxide emissions.

Since 1990, IBM has saved 5.8 billion kWh of electricity consumption, avoided 3.7 million metric tons of CO2 emissions and saved $442 million through its annual conservation actions.

In 2011, the company completed more than 2,300 energy conservation projects at 364 IBM locations worldwide, including upgrading equipment to reduce electricity use by 14,900 MWh and natural gas use by 2,500 MMBTUs and the installation of efficient lighting systems at 203 locations, which cut electricity use by 16,220 MWh and saved $1.9 million in energy costs, the report says.

IBM also deployed its real-time energy management technology to increase efficiency at 10 of its highest energy consuming facilities. The company plans to add its energy management software to 18 additional locations in 2012.

IBM completed 228 projects at 86 existing data centers to reduce energy use more than 33,700 MWh and save more than $3.8 million. The projects included blocking cable and rack openings, balancing air flow as well as shutting down, upgrading and reprovisioning air flow from computer room air conditioning units. Total savings from these projects are equivalent to the energy use of a 4,000- to 6,000-square-meter IBM strategic data center.

IBM is using virtualization technologies to consolidate multiple workloads from servers and storage systems onto single systems, an effort that reduced energy use 142,000 MWh and saved $16.5 million in 2011 from the previous year. The company has virtualized more than 90,000 applications in its owned and leased data centers over the past three years.

Last month, IBM announced that its collaboration with the Leibniz Supercomputing Center in Germany had developed a hot-water cooled supercomputer that consumes 40 percent less energy than a comparable air-cooled machine and is 10 times more compact.

IBM cuts its energy-related carbon emissions by 16 percent since its 2005 base year, to 2,182,000 metric tons in 2011. The reduction, which beat out the company’s corporate goal to reduce CO2 emissions associated with its energy use 12 percent between 2005 and 2012, was achieved through conservation projects and purchasing electricity from renewable sources.

Approaches to Managing EHS&S Data
Sponsored By: Enablon

  
Just the Facts: 8 Popular Misconceptions about LEDs & Controls
Sponsored By: Digital Lumens

  
Choosing the Correct Emission Control Technology
Sponsored By: Anguil Environmental Systems

  
Run an Efficient EHS Audit Program - A How-to Guide
Sponsored By: Sphera Solutions

  

One thought on “IBM Sustainability Report: $43M in Energy Costs Saved in 2011

  1. Greetings! really nice to drop by. . please connect me to interested readers to share ideas about my concept of a :international planetary water pipeline to re channel flood waters from the flooded tropics to the drought stricken countries in the world. this is patterned after the Alaska oil pipeline, only water will be transported. thank you, keep praying

Leave a Comment