If you've no account register here first time
User Name :
User Email :
Password :

Login Now

Atkins Wins Decommissioning Contract

Centrica Energy has awarded engineering and environmental consultancy Atkins a multidisciplinary pre-FEED (front end engineering design) decommissioning contract.

The five-year agreement will see Atkins provide the UK energy company with engineering and design services, drawing on a range of Atkins’ expertise across a number of disciplines in subsea, structures, pressure systems and environmental feasibility studies.

The agreement applies to any oil and gas fields Centrica decides to decommission in the UK or Netherlands during the contract period.

Atkins is one of the leading environmental consulting firms according to the latest research by Environment Analyst in its Global Environmental Consulting Strategies and Competitor Analysis 2014 report.

 

Practical Guide to Transforming Energy Data into Better Buildings
Sponsored By: Lucid

  
Packaging LED & Advanced Rooftop Unit Control (ARC) Retrofits for Maximum Performance
Sponsored By: Transformative Wave

  
Operationalizing EHS Management: Bridge the Gap from Strategy to Execution
Sponsored By: LNS Research

  
Choosing the Correct Emission Control Technology
Sponsored By: Anguil Environmental Systems

  

Leave a Comment